Drop-in · Plug-in · Seal
Watch the plant disappear.
The same 1 MW of AI in Frankfurt, modelled four ways. One server for every step; the Plug-in kit and sealed rack are in design.
The PUE paradox
At the drop-in step, PUE stays at 1.42 while energy falls and tokens per kWh rise 22%. PUE cannot see the gain, so we report energy and tokens per kWh.
PUE±0%
Energy−3%
Tokens/kWh+22%
Model assumes Nova 8 at ~31 M tokens/kWh, +22% on the air reference (estimate; server power not yet wall-metered). Both are whole-server figures, so each server’s fans are counted once. Global average PUE is 1.54, flat for six years (Uptime Institute 2025, reported). ISO/IEC 30134-2: PUE "should not be used to compare different data centres."
More tokens, less opexZero unplanned downtime
03 · Run · Seal the rack
1.11
PUE −22%
Simulated27.9M
Tokens per grid kWh +56%
Simulated7,878MWh/yr
Facility energy −27%
Simulated17
Racks for 1 MW −76%
SimulatedModel: Nexalus greenest-data-centre model, 1 MW IT in Frankfurt, 80% load. Tokens per grid kWh = whole-server tokens per kWh (25.4 M air, 31.0 M Nova 8, estimate) × IT power ÷ facility power, so fans count once. 70% of captured heat sold assumes a district network large enough to take the heat all year; a single seasonal building takes 20–35%. Homes = yearly heat use at 12 MWh a home. Evaporative towers at 1.6 L per kWh of heat rejected. Overheads are typical fractions per architecture, scaled by climate; illustrative, not a site survey.
02 · Watch the plant disappear