Heat, a second product

At 60 °C, heat becomes a second product for the operator.

Most data centres reject heat at 30–40 °C, too cool to use. Water at 60 °C heats homes, greenhouses and heat networks directly.

up to98%

of server heat into water, 93% on average. Measured by RISE on an earlier sealed 1OU server, not Nova 8.

Measured · third party
Water in
RISE (Research Institutes of Sweden) measured an earlier sealed Nexalus 1OU (OCP) server, not Nova 8, in its lab, Dec 2021, at nine load and inlet points; the report was written by Nexalus from RISE’s measurements and the paper is peer-reviewed with RISE co-authors, IEEE THERMINIC 2022 (DOI 10.1109/THERMINIC57263.2022.9950635). Bar values digitised from the report chart (±0.5 pt). Nova 8 Plug-in design value is up to 90%.

The law is moving Reported

  1. Jul 2026Germany: new data centres must reuse 10% of their energy
  2. 2028Germany: the reuse floor rises to 20%
  3. NowEU: sites ≥ 500 kW report energy reuse every year
Germany Energy Efficiency Act (EnEfG): energy-reuse factor 10% for new sites from 1 Jul 2026, 15% from 2027, 20% from 2028. EU Energy Efficiency Directive 2023/1791 Art. 12 and Delegated Regulation (EU) 2024/1364 reporting for data centres of 500 kW and above.

Drag the server’s outlet temperature

60°C out→ 58 °C delivered after the heat exchanger

5 of 8 uses directly; hot tap water and wash water need a small top-up

Reusable 60 °C heat
  • Underfloor heating35–45 °C
  • Greenhouse heating40–50 °C
  • Parts washing50–65 °C
  • Low-temp heat network50–70 °C
  • Radiators55–70 °C
  • Hot tap water≥ 60 °C
  • Factory wash water60–85 °C
  • Absorption chilling~90 °C

Use directly Mix down Pre-heat, small top-upThe 60 °C point is a design target; use temperatures are reported. Target Reported

In practice A seasonal user takes 20–35% of the heat a year; a 24/7 food or pharma plant takes 80–95%. Simulated

Use temperatures: Nexalus IMR heat-reuse slide (hot tap water ≥ 60 °C delivered, radiators, underfloor, parts washing, wash water, absorption chilling); low-temperature district heating per 4th-generation practice; greenhouse range is our estimate. Delivered = water out of the server minus ~2 °C across the heat exchanger (design assumption). 70% sold (journey and scale pages) assumes a district network large enough to take the heat all year; a single seasonal building takes 20–35%. Capture range: Nexalus IMR pilot-hall model (seasonal sink, ~7% of the power bill offset) and CIP wash-water case.